Getting your asphalt paver screed adjustments right determines whether you lay down perfect paving or deal with costly rework. 

The screed controls mat thickness, density, and surface quality. When adjustments are off, you'll see streaking, thickness variations, and low-density spots that rollers can't fix. 

This guide covers the five core screed adjustments, like angle of attack, tow point height, screed crown, strike-off plates, and vibration or tamper settings, and how to set each one for consistent, high-quality mats.

Understanding the Role of the Screed

The screed shapes, compacts, and textures asphalt as it flows underneath the paver. The screed is free-floating and connected to the tractor only at the tow point, allowing it to find its natural level as material flows beneath it. 

The screed provides initial compaction through its weight and vibratory systems, while rollers complete the compaction process to achieve final density specifications.

The screed works by balancing six key forces: 

  1. Towing force from the tractor 
  2. Resistance from the hot mix asphalt head
  3. Screed weight 
  4. Upward force from the material underneath 
  5. Additional downward force from tampers or vibrators
  6. Friction between the screed and asphalt

The connection between paver operation, screed settings, and mat quality

Screed setup directly affects your bottom line. When your angle of attack is correct, tow point height is set properly, and crown adjustments match the job requirements, you get consistent thickness and smooth texture.

A 1-inch movement in tow point elevation produces approximately 0.125-inch movement in the screed's leading edge. This means small adjustments have measurable effects on mat thickness. 

According to NCAT research, each extra 1% mat density results in 10% extra service life, making proper screed adjustments critical for long-term pavement performance.

Note: For detailed comparisons of paving equipment manufacturers, visit our guide on paving equipment manufacturers, and for basic equipment needs, check out our article on paving equipment basics.

Core Asphalt Paver Screed Adjustments

The five core adjustments are angle of attack, tow point height, screed crown, strike-off plates, and vibration and tamper settings. 

Each one controls how mix flows under the screed and drives mat thickness, smoothness, and density. See the chart below for what each affects and how to set them:

Adjustment Type

Effect on Mat

Common Fix if Wrong

Angle of Attack

Controls density and smoothness

Adjust tow point height gradually

Screed Crown

Creates drainage slope

Match crown to road profile requirements

Tow Point Height

Determines mat thickness

Raise for thicker, lower for thinner mat

Strike-Off Plates

Initial mat shaping

Adjust for aggregate size and lift thickness

Vibration and Tamper

Pre-compaction level

Match frequency and amplitude to mix design

1. Angle of attack

Angle of attack is the slight upward angle at the screed's front edge. According to industry standards, the correct angle of attack is 3 mm (1/8 inch) to 6 mm (1/4 inch) with a slight “nose up” attitude. This angle determines how the screed rides through the material and affects both density and surface texture.

  • Signs your angle is too high: Open texture behind the screed, excessive material buildup in front of the screed, or the screed “plowing” through material instead of floating.
  • Signs your angle is too low: When the screed runs with a “nose down” angle of attack, you'll see open texture behind the screed plate. The trailing edge lifts off the material, reducing compaction.
  • How to measure and adjust: Get on your hands and knees with a level, straight edge, and tape measure to check screed plates are level. 

Start with tow point cylinders centered at zero, then adjust up or down to get the correct angle. Make adjustments in small increments; turn the bolt a quarter of an inch, then double-check the nose position.

2. Screed crown

Crown is the slight arch built into the screed to create a drainage slope. Most roads need crown for water runoff, typically 2% slope from the center to the edges. The screed crown setting must match the road's designed profile.

  • Adjusting for drainage vs. flat surfaces: For roads requiring drainage, set the crown to match engineering specifications. 

    For parking lots or areas requiring flat surfaces, minimize or eliminate crown settings. Prior to the day's start, operators should stringline the rear edge of their machine to check for flatness and pre-set the crown in the main extension.
  • Best practices for matching crown to road profile: According to Asphalt Institute guidelines, the lead crown should be set slightly higher than the tail crown by about 3 mm (0.125 inches). This prevents centerline streaking and improves water runoff.

3. Tow point height

Tow point height controls mat thickness consistency. As the tow point rises in elevation, the screed angle increases, which produces thicker mat. When the tow point gets lower, the screed angle drops, which produces thinner mat.

Step-by-step tow point adjustment process:

  1. Identify thickness requirements from project specifications.
  2. Make small adjustments; remember the 1-inch to 0.125-inch ratio.
  3. Wait for screed response; according to Transportation Research Board studies, it typically takes five tow lengths after a desired level is input for a screed to arrive at the new level.
  4. Monitor mat thickness using depth rods or electronic measuring devices.
  5. Fine-tune as needed, but avoid constant adjustments that create waves.

How tow point changes interact with angle of attack: As you modify the tow point cylinders up, the tow arms lift slightly, causing the front of the screed (nose) to rise, which creates down-pressure on the back end.

4. Strike-off plates

Strike-off plates provide initial mat shaping before material passes under the main screed plate. Some pavers have a “pre-strike-off unit” or curved strike-off blade at the leading edge for use with “critical” material that meters the amount of material going under the screed plate.

How to adjust for different aggregate sizes and lift thicknesses: 

  • Thicker lifts and larger aggregate sizes require higher strike-off settings to allow proper material flow.

  • The screed shield assembly can be moved up for normal material flow or down for dense mixes and thin lifts.

5. Vibration and tamper settings

Vibration aids compaction by providing additional downward force beyond the screed's weight. Screed compaction depends on screed weight, vibration frequency, and vibration amplitude. 

On some pavers, both frequency (vibrations per minute) and amplitude (range of motion) can be adjusted, while others have constant frequency with adjustable amplitude.

Matching frequency and amplitude to mix design: 

  • Frequency and amplitude are set according to the type of paver, speed of the paver, thickness of the mat, and characteristics of the mixture.

  • Dense-graded mixes typically need higher amplitude settings, while fine-graded mixes work better with lower settings. Increasing amplitude (stroke) of the tamper bar or decreasing paving speed are inputs that need adjustment per job parameters.

Setting Up for a Paving Job: Step by Step

Proper asphalt paver screed adjustments start before you begin paving. These paving steps create the foundation for consistent mat quality throughout your project.

  1. Heat the screed plates to operating temperature before material contact. The screed plate will warm up as it's exposed to hot mix, but the mat will be substandard while the screed is cold.
  2. Check screed level and flatness using stringlines and measuring devices. Stringline the rear edge to check for flatness and pre-set crown, then stringline the front edge to check for lead crown.
  3. Set tow point cylinders to center position as your starting reference point. Begin with tow point cylinders centered at zero, then adjust up or down to get the correct angle of attack.
  4. Adjust angle of attack to the correct 1/8 to 1/4 inch nose-up position using levels and straight edges.
  5. Configure crown settings based on project specifications and drainage requirements.
  6. Set vibration and tamper parameters according to your mix design, lift thickness, and paving speed.
  7. Test with initial material and make fine adjustments based on mat appearance and thickness measurements.
  8. Document settings for consistent reproduction throughout the project.

Troubleshooting Common Mat Defects with Screed Adjustments

Streaks or lines

Mat tearing may be triggered by inadequate mix delivered to a particular area in front of the screed, or parts of the mat surface being dragged along by the screed. Warped or worn screed plates increase the likelihood of dragging aggregate particles along the mat surface.

Install reverse augers or paddles near the gearbox if not already installed, or check existing ones for wear and proper operation. Check for material buildup inside the screed, as interior buildup can significantly impact adjustments. 

Low density

Examine vibration/tamper frequency and amplitude settings first. Research from the National Center for Asphalt Technology shows that proper screed pre-compaction is critical, with an extra 1% mat density improving fatigue performance by up to 43.8%.

Increase amplitude settings for thicker mats or dense-graded mixes. Increasing screed weight, increasing amplitude of the tamper bar, or decreasing paving speed are inputs that typically help.

Waves or ripples

A screed operator who repeatedly modifies the screed level to produce the correct mat thickness will end up producing an overly wavy, uneven pavement. Excessive or rapid tow point adjustments disrupt the screed's floating equilibrium.

Make smaller, more gradual adjustments and allow time for the screed to respond. If you adjust the tow point too quickly, making an erratic change, the trailing edge will lower into the mat and drag until the screed levels out. 

Thickness variations

1-inch movement in tow point elevation produces approximately 0.125-inch movement in the screed's leading edge. Small tow point variations create noticeable thickness changes across the mat.

Use automatic grade control systems when available to maintain accurate tow point height. For manual operations, make minimal adjustments and focus on maintaining steady paver speed and material flow. 

Note: For more guidance on maintaining quality throughout your asphalt projects, check out our comprehensive guide. If you're just starting out in the paving business, our guide on the costs of starting an asphalt business covers must-have equipment and setup considerations.

Keep Your Team Dialed in with OneCrew

Managing asphalt paver screed adjustments across multiple crews and jobs gets complicated fast. You need settings logged, operators trained, and equipment tracked to maintain consistent quality. 

That's where OneCrew comes in.

OneCrew was built for project-based paving contractors who need more than basic job tracking. Here's what the platform handles for screed management and equipment operations:

  • Schedule preventive maintenance for pavers and screeds to avoid on-site problems
  • Log screed settings for different job types, mix designs, and crew preferences
  • Assign equipment and track operator performance across multiple paving projects
  • Track project costs, including rework expenses from incorrect screed setup

Book a free demo with OneCrew and see how proper project management keeps your asphalt paver screed adjustments and your entire operation running smoothly.

FAQs

1. What is the angle of attack on a paver screed?

The angle of attack is the slight upward angle at the screed's front edge that should be 1/8 to 1/4 inch nose-up. This angle controls how the screed rides through material and affects density and surface texture. 

2. How do you adjust the crown on a screed?

Crown adjustment involves setting the screed's arch to create proper drainage slope across the pavement width. Most screeds have adjustable crown mechanisms that you set before paving begins. The lead crown should typically be 1/8 inch higher than the tail crown.

3. What causes streaks in asphalt paving?

Streaks result from bad material flow to specific areas, worn or warped screed plates, or excessive paving speed. Cold screed areas can also cause material to stick and drag, creating visible lines.

4. How often should I calibrate my paver screed?

Calibrate your screed adjustments at the start of each shift and whenever the paver is moved. Weekly comprehensive checks confirm all adjustment mechanisms operate properly. Complete end-of-season inspections should include thorough component checks.

5. Can screed adjustments fix low-density issues?

Proper vibration/tamper frequency and amplitude adjustments can impact mat density. The screed should provide 85% of Theoretical Maximum Density (Rice density) through weight and vibratory action. Increasing amplitude for thicker mats and adjusting frequency to match mix characteristics improves pre-compaction results.

6. How do weather conditions affect screed setup?

Cold weather requires longer screed preheating times and may need adjusted tamper/vibration settings to maintain compaction. Hot weather can make material too fluid, requiring angle of attack modifications. 